• WhatsApp:+971-564395756
  • CONTACT US
    • HQ:Xinhua Park,Economic Development Zone,Cangzhou City,Hebei Province,China.
    • Tel: +86-317-3051833
    • Fax: +86-317-3051835
    • WhatsApp:+971-564395756
    • Email:?[email protected]
    • Russia Moscow Office
    • +791-53053973
    • UAE Dubai Office:
    • +971-564395756
    You are here:HOME > Videos >

    100m Distance Cuttings Transfer Pump

    FD Petrol cuttings transfer pump can transfer the water based mud ,oil based mud,oily sludge to 100 meters …
    CLASSES:Videos TAG: AUTHOR:admin DATA:2019-10-30 00:37:00

    Verti G Works for WBM Drilling Waste Management

    FD Petrol patented screen technology Verti G makes it possible for WBM drilling waste management without plugging.…
    CLASSES:Videos TAG: AUTHOR:admin DATA:2019-09-09 23:29:00

    SGL-02 Verti G Training Test With OBM Waste

    FD Petrol SGL-02 verti G cuttings dryer at clients jobsite,the drill waste is collected by cuttings skip and tested at clients factory.…
    CLASSES:Videos TAG: AUTHOR:admin DATA:2018-06-21 22:57:00

    HDD Mud Recycling System

    FD Petrol compact HDD mud recovery system combined of double deck shale shaker and desander unit works in our client jobsite and get great performance …
    CLASSES:Videos TAG: AUTHOR:admin DATA:2018-03-06 15:09:00

    High Standard Oilfield Camp

    FD Petrol manufactured oilfield camps since 1995,our valued overseas customers including Saipem,Saudi Aramco,Shell,Oasis Petroluem,NIDC,NDC,IOEC,SONATRACH,PDVSA,Cuba Oil,Nabors Drilling etc.…
    CLASSES:Videos TAG: AUTHOR:admin DATA:2017-12-14 01:40:35

    Max Dry DW2000 Centrifuge for Sludge Treatment

    Based on client requirement,the treated sludge should contain less than 20% moisture ,it is a great challenge for industry centrifuge,FD Petrol MAX DRY DW2000 DEWATERING CENTRIFUGE has achieved 17% mositure and perfect meet client requiremen…
    CLASSES:Videos TAG: AUTHOR:admin DATA:2017-10-03 19:35:00

    High G Dryer For Waste Cuttings Treatment

    High G dryer shaker for shale gas drilling water based mud cuttings treatment…
    CLASSES:Videos TAG: AUTHOR:admin DATA:2017-03-22 13:06:00

    Solidification Unit Working for WBM Waste Management

    The solidification process operates continuously, requires pre-set solidification chemistry to be added to the waste when it is pumped or loaded into the solidification unit, a vacuum chemical feed system introduces the solidification agent…
    CLASSES:Videos TAG: AUTHOR:admin DATA:2016-03-22 01:53:00
  • Home
  • 1
  • 2
  • 3
  • 下一page
  • Last Page
  • Total 3page20Records

  • FD Petrol Drilling Waste Management & Solids Control & Rig Camp?? 
    2019年743期期好彩